The Pittsburgh Water and Sewer Authority EV Charging station project is our first Level 3 - Electric Vehicle charger installation that we completed. The charger was purchased by PWSA from ChargePoint and we completed a training to be qualified to install and start up the unit. The unit is fed with a new 480V – 125 Amp three-phase circuit from the existing building and required us to install a concrete base to support the charger which will output 62.5 KW and communicates wirelessly.